Most Advanced SS Non Woven Fabric Making Machine Hot Sell SS Double Beams Production Line

Fabric width

1600mm(Availed width)

Maximum winding diameter

Φ2000MM

Capacity

According70 g/㎡,20t/24h

Monofilament size

<2.5d

পণ্যের বর্ণনা

1.Company Profile:

2.Product details

2-1:Main Technology data
1.Fabric width:1600mm(Availed width)
2.Maximum winding diameterΦ2000MM
3.CapacityAccording70 g/㎡,20t/24h
4.Monofilament size:<2.5d
5.Fabric weight:10~150g/㎡
6.Designed speed:350M/MIN(Working speed:300 M/MIN)
7.Product quality standard: According to the samples confirmed by both parties, according to the data confirmed by both parties.

2-2. product description
1. SS Nonwoven Machine Adopts an intelligent electrical control cabinet and spinning drafting system. সিস্টেম কন্ট্রোলিং মোড উন্নত এসি ফ্রিকোয়েন্সি-মডুলেটেড গতিতে বৈশিষ্ট্যযুক্ত, সম্পূর্ণ ডিজিটাল সিঙ্ক্রোনাইজড যোগাযোগ.
2. SS Nonwoven Machine is double-beam, owns obvious higher quality as well as obvious larger quantity in production than S Nonwoven Machine.
And SS Nonwoven Machine runs in high efficiency and low power consumption. Based on the features above, SS Nonwoven Machine can help customers to save labor and wide compatibility with different high requirements of productions.
3. SS Nonwoven Machine is the professional manufacturer in double layers non-woven fabric.
4. About the package: we pack the main machine parts in wooden cases; the electrical parts will be packed with plastic and then packed into wooden cases; With the steel structure, they will be packed into containers.

2-3 Technical Parameter

The main specifications of SS Spunbond Nonwoven Machine:
মডেল নাম্বার.GL-SS
এসএমএস(পণ্যের প্রস্থ)1600 মিমি2400 মিমি3200 মিমি
সরঞ্জামের আকার29x13x11 m30x14x11 m30x15x11 m
গতি350 মি/মিনিট350 মি/মিনিট350 মি/মিনিট
গ্রাম ওজন10-150 g/m210-150 g/m210-150 g/m2
ফলন(অনুযায়ী পণ্য 40 g/m2)9-10 T/DAY13-14 T/DAY18-19 T/DAY

 

3.Main parts


1.Power:7.5kw
2.Air Expansion Shaft:3200X3 PCS
3.Max diameter of fabric roll:1500মিমি
4.Max. roll Weight:750KG

Power:4KW

গতি:250 Meters/Min


1.The main driving roller is made of seamless steel tube
2.Cutting speed:800-1000মি/মিনিট
3. Siemens Bede AC motor, 15kw * 1 set, Fuji variable frequency controller of Japan
4.Minimum cutting width: 100 মিমি
5.Maximum winding diameter: 1000মিমি
6.Number of slitting knives 16 sets
7. 3 carbon fiber gas expansion shafts


1.The speed of exhaust fan is adjustable2.Accessories: GD-SM-SO2 static mixer
3.Total air volume: 15000-23000 m³/ h
4.Air pressure regulator: Fuji Inverter(RKC-F900)
5.The fan power is 75KW * 1 set, 90kW * 1 set, including the exhaust pipe,and the suction air is discharged to the outdoor
6. The power of cold air fan is 75kw, 2sets, Siemens Bede motor is adopted

4.আবেদন

PACKAG – শপিং ব্যাগ, Rice Packaging, Clothes packaging, ইত্যাদি.
HYGIENEBaby and adult diapers, Female hygiene, ইত্যাদি.
MEDICALSurgeon’s masks, Disposable garments, ইত্যাদি.
FURNITUREBeds Cover, Seatings Cover, ইত্যাদি.
TECHNICALGeotextiles, Agriculture, ইত্যাদি.
FILTRATIONAir, Gas, Liquids, ইত্যাদি.

5.Packing & Shipping

6.our service

Pre-Sales One-stop Service
After-Sales Service
* Inquiry and consulting support
*One year warranty
* Lastest industry trends
* Machine test video before delivery
* More fit bag making solution
English Manual. Electric Diagram
* Sample testing support
* Training how to instal the machine, training how to use
* view our Factory
the machine
Suggest layout support
*Engineers available to service machinery overseas

7.FAQ

1. Q:How long will your engineer reach our factory?
A:Within one week after everything ready (machine arrival your factory, non woven material,
power source, air compressor etc.Prepared)
2. Q:Does your engineer understand English?
A:Our engineers understand a little English. All our engineers have more than five years machine
installation experience.
3. Q:What should we charge for your engineer?
A:You should charge for the cost of our engineer’s air tickets, hotel, food, and also their salary
800CNY one day per person.
4. QHow many days it will take for the intallation?
A: It will take around 45 days, depends on the machine type.
5. Q:How do we solve the machine problem after your engineer leaving?
A:Generally speaking, there will be no problem after finishing installation. In case you have any
problem, you can contact our sales at any time. Our engineers will take a solution video according
your description.

উদ্ধৃতির জন্য আবেদন